New Belgium Brewing Company

Commercial rooftop PV at the New Belgium Brewing Company brewery in Asheville. Duke Energy SDGI controller with dual-RTAC comms isolation.

Rooftop solar PV array on the New Belgium Brewing Company brewery in Asheville, NC.

Scope of work

Commercial / industrial rooftop solar at the New Belgium Brewing Company brewery in Asheville, NC, with the Duke Energy required Small-scale Distributed Generation (SDGI) controller — built by ReNu Energy with REIG owning the SCADA scope.

What we delivered

  • Provided and installed the Duke Energy SDGI control system that lets Duke remotely communicate with and control the small-scale system.
  • Two RTACs deployed to isolate the comms domains from each other — Duke on one side, the customer's monitoring on the other.
  • Worked with the EPC and the inverter manufacturer to build the correct comms stack between RTAC and string-level hardware.
  • Assisted Duke with final system testing during interconnect.
  • Verified remote data collection by the brewery's asset team after hand-over.

Outcome

A commercial-scale rooftop PV system in production, with Duke holding the control authority it required for distributed generation and the brewery seeing clean monitoring data on its own dashboard.

Project sheet

At a glance

  • Capacity

    Commercial rooftop · Duke SDGI

  • Location

    Asheville, NC

  • Client / EPC

    ReNu Energy

  • Commissioned

    2023

  • Scope delivered

    • SDGI Control System
    • Dual RTAC Comms
    • Inverter Integration
    • Commissioning