80 MW utility-scale PV in Warrenton, GA. Full optical-fiber spine, NorCal DAS/SCADA install, and end-to-end commissioning.

80 MW Bulldog Solar utility-scale PV plant near Warrenton, Georgia.

Scope of work

REIG delivered the optical-fiber backbone, the data acquisition and SCADA hardware install, and final commissioning for an 80 MW utility-scale PV plant in Warrenton, GA — built by the EPC, monitored on a NorCal platform.

What we delivered

  • Optical fiber installation, termination, and bi-directional OTDR acceptance testing on every strand.
  • Construction management and physical install of the NorCal-supplied DAS/SCADA hardware, weather stations, and communication cabling across the site.
  • Final commissioning sweep with NorCal — verifying fiber communications, inverter comms, MET station data, and every polled point delivering accurate values into the NorCal GUI servers.

Outcome

A fully-commissioned 80 MW plant where every telemetry point — from string-level inverters to the central met station — landed cleanly on the NorCal portal at hand-over.

Project sheet

At a glance

  • Capacity

    80 MW AC

  • Location

    Warrenton, GA

  • Client / EPC

    Utility-scale EPC

  • Commissioned

    2023

  • Scope delivered

    • Fiber Splicing & OTDR
    • DAS / SCADA Install
    • MET Stations
    • Commissioning