SCADA
Supervisory Control and Data Acquisition. The software and hardware architecture used to monitor, control, and analyze the performance of a utility-scale solar plant.
DAS
Data Acquisition System. The network of sensors (MET stations, pyranometers, inverter monitors) that collects granular performance data across the array.
FAT
Factory Acceptance Testing. The phase where SCADA logic and hardware enclosures are tested on the bench before shipping to the site.
SAT
Site Acceptance Testing. The on-site validation where point-to-point connections are verified, ensuring the utility receives accurate telemetry.
OTDR
Optical Time-Domain Reflectometer. An instrument used to characterize an optical fiber, allowing technicians to find degraded splices or micro-bends that cause data loss.
COD
Commercial Operation Date. The day a solar facility is officially permitted to generate and sell power to the grid.
RTAC
Real-Time Automation Controller. A ruggedized industrial computer (often manufactured by SEL) used as the primary data concentrator and logic engine in utility substations.