
Data Acquisition Systems & MET Stations
Flawed pyranometer data ruins performance modeling. We mount, wire, and verify sensors so your plant's telemetry is bulletproof.
Bad weather data means bad revenue models.
A MET station isn't a pole with sensors. It is the baseline for your plant's performance ratio. If irradiance drops, or BoM temperature drifts, your O&M analytics are useless — and so is the case you make to lenders at refi.
We specify, mount, wire, and verify the full instrument stack. OEM calibration sheets follow the asset — every sensor traceable, every reading defensible.
±2.0%
Class A pyranometer accuracy
IEC 61724-1
Performance monitoring standard
- 10m POA
Class A Pyranometer
Hukseflux SR30 · spectrally flat
285–3000 nm · ±2.0% accuracy · ventilated heated dome
10m POA - 10m AGL10m AGL
Anemometer + Vane
NRG #40C · class 1.0
1–96 m/s · ±0.1 m/s · 360° vane resolution
- 2m AGL
Ambient Temp + RH
Vaisala HMP155
−80…+60°C · ±0.176°C · capacitive HUMICAP
2m AGL - ModuleModule
Back-of-Module Temp
PT-100 1/3 DIN · adhesive
4 sensors per array · centred on module · BoM mapped
- 1.5m AGL
Albedo Sensor
Apogee SP-510 (up + down)
Bifacial-aware · 0.05 albedo resolution
1.5m AGL
Ground · concrete pier foundation
Defensible data from day one.
Every sensor traceable to the OEM cert sheet. Every analog signal verified on the Modbus map. Every mast erected to spec.
Calibration Certificates
OEM-issued calibration sheets for every Class A pyranometer, anemometer, and temperature sensor — tracked, archived, and handed over to the asset owner.
Point-to-Point Validation
Every analog signal walked from the sensor terminal to the Modbus register on the ISO portal. Sign-offs on the SAT checklist. No surprises during witness testing.
Mast & Mounting
Rigid mast erection and cross-arm mounting prevents wind-induced vibration noise on irradiance readings. Pier foundations sized to your geotech, sensors clear of array shading.
- Class A pyranometer (POA + horizontal)
- Back-of-module temperature
- Albedo for bifacial arrays
Frequently Asked Questions
Guarantee your performance baseline.
Ensure your capacity testing succeeds with perfectly mapped MET stations.
