Back to projects
10.5 MW ACSmall-scale utility-connected PV

Hertford Solar

10.5 MW utility PV in Ahoskie, NC. RenergyWare enclosure platform, sensor stack, and full optical-fiber + SCADA build-out.

10.5 MW Hertford Solar plant in Ahoskie, North Carolina.

Scope of work

A 10.5 MW utility-scale PV plant for Axis Energy in Ahoskie, NC. REIG owned the RenergyWare hardware platform plus the full network and commissioning scope.

What we delivered

  • RenergyWare enclosures and the full weather-sensors platform deployed across the site.
  • Optical fiber installation, termination, and OTDR acceptance testing.
  • Construction management and install of the RenergyWare-supplied DAS/SCADA hardware, weather stations, and communication cabling.
  • Final commissioning — fiber comms, inverter comms, and every MET station input verified.

Outcome

A fully-commissioned 10.5 MW site running on standardised RenergyWare hardware, with a sensor stack delivering Class A irradiance data to the asset owner.

Project sheet

At a glance

  • Capacity

    10.5 MW AC

  • Location

    Ahoskie, NC

  • Client / EPC

    Axis Energy

  • Commissioned

    2023

  • Scope delivered

    • RenergyWare Platform
    • Fiber Splicing & OTDR
    • DAS / SCADA Install
    • Commissioning
Discuss a similar build
Call UsConsultSubmit RFP