REIG handles solar DAS and SCADA integration for utility-scale and distributed solar sites across the United States, and we wrote this process down because prospective clients keep asking what actually happens between the first phone call and the day their dashboard goes live. Below, our technical team walks through the four steps we use on every project, plus the one place where the process adds time instead of saving it.

What Is Solar DAS and SCADA Integration?

A Data Acquisition System, or DAS, is the hardware and software layer that pulls raw performance numbers directly off solar equipment: inverter output, string-level current, irradiance, module temperature. SCADA, or Supervisory Control and Data Acquisition, sits one layer up. It is the system an operations team uses to monitor alarms and, on many sites, remotely control breakers, trackers, and inverters across an entire plant. The problem REIG solves is that most solar sites end up with DAS hardware from one vendor and a SCADA platform from another, installed years apart, with no shared data format. Solar DAS and SCADA integration is the engineering work that connects those two systems into one data pipeline, so an operator is not logging into four separate portals to track down a single fault code.

DAS SCADA REIG Dashboard

Step 1: Start with a Conversation About Your Site

Every REIG project opens with a working call, not a sales pitch. Dana Whitfield, P.E., REIG's lead controls engineer, or a member of her team spends roughly 45 minutes asking about your existing DAS and SCADA hardware, how your operations staff currently finds and clears alarms, and what is actually broken today. That conversation sets the direction for a solution built around your equipment, not a generic template.

Whether a client runs a 2 MW community solar array or a 200 MW utility portfolio, the questions are the same: what data does the client already have, what data is missing, and who on staff actually needs to see it day to day. On larger utility-scale projects, REIG also loops in Raymond Ortiz, a California-licensed C-10 electrical contractor who has independently inspected wiring, grounding, and permit documentation on several REIG sites, including the Kern County project, before REIG's team finalizes a proposal. That outside review catches code questions early, before they turn into a change order during commissioning. REIG is not in the business of selling installations; REIG connects the systems a client already owns, and brings in outside licensed eyes whenever a project's scope calls for it.

Step 2: Define Problems and Goals

Once REIG understands a site, the team defines the specific problems the integration needs to solve. This step matters because a generic dashboard is not a goal. A utility client in Kern County needed inverter-level fault alerts inside 90 seconds instead of the 20-minute polling cycle their old DAS used; that specific, measurable target drove every decision REIG made on that project.

REIG's engineers listen first, then ask direct follow-up questions about uptime targets, reporting requirements, and who on staff needs operator-level SCADA access versus read-only dashboards. The result is a system tuned to the pain points named in step one, not a one-size dashboard.

Step 3: In-Depth Analysis and Planning

With goals defined, REIG's engineers review a site's single-line diagrams, existing DAS and SCADA documentation, communication protocols (commonly Modbus TCP or DNP3), and any prior integration attempts. This phase usually takes three to five business days and includes a site visit to confirm that what is on the drawings matches what is actually wired in the field, because the two do not always agree. On the Kern County project, this phase surfaced an undocumented RS-485 wiring run between two inverter blocks that the original installer never logged on any as-built drawing, a detail that would have caused a two-week troubleshooting delay after go-live if REIG's engineers had not caught it during the walkthrough.

Here is the honest tradeoff: this analysis phase typically adds one to two weeks to a REIG project compared to integrators who skip straight to configuration and fix problems after the system is already live. That time tends to pay for itself the first time a 2 a.m. alarm points to the correct breaker instead of a guess, or the first time a client's own technician adds equipment eighteen months later using REIG's documentation instead of calling a vendor that no longer remembers the site. But if a timeline requires a system live in a few days, REIG's process is not the fastest option on the market, and REIG will say so directly during the first call rather than after a client has already signed a contract.

Step 4: Transparent Pricing

After analysis, REIG sends a fixed price quote, not an hourly estimate that grows as the project goes on. The quote itemizes hardware, engineering labor, commissioning, and any licensing fees tied to the client's SCADA platform, so there are no surprise change orders once work starts.

REIG's pricing for solar DAS and SCADA integration work reflects the documentation review completed in step three. Because the team has already seen the wiring diagrams and protocol stack, the quote is built on what the site actually has, not a rough estimate based on square footage or panel count.

DAS vs. SCADA: A Side-by-Side Comparison

Clients often ask REIG whether they need DAS, SCADA, or both. In nearly every solar DAS and SCADA integration project REIG runs, the answer is both, because the two systems do different jobs. The table below breaks down where each one fits.

FeatureDASSCADA
Primary functionCollects raw performance data from equipmentMonitors and controls equipment across the plant
Typical dataInverter output, irradiance, module temperature, string currentBreaker status, alarm states, setpoints, dispatch commands
Control capabilityUsually read-onlyOften includes remote control of breakers, trackers, inverters
Common protocolsModbus RTU/TCP, proprietary vendor APIsDNP3, IEC 61850, Modbus TCP
Who uses it dailyAsset managers, performance engineersPlant operators, NERC CIP compliance staff
Before 20 min After 90 sec

The REIG Advantage for Solar DAS and SCADA Integration

REIG's process gives clients three things most integrators do not: a named engineer who stays on the project from the first call to commissioning, a fixed price quote instead of a changing estimate, and documentation of exactly what was connected and how, so a client's own staff can maintain the system after REIG leaves. On the Kern County project, that documentation let the site's own technicians add a fifth inverter block eight months later without calling REIG back in.

REIG is not the right fit for every site. A client that needs a system live in under a week, or wants the lowest possible upfront number regardless of long-term maintainability, may be better served by a faster, less-documented integrator. REIG's DAS integration services and SCADA monitoring services are built for clients who plan to own a site for a decade or more.

REIG's standards reference established industry guidance, including the National Renewable Energy Laboratory's work on PV performance monitoring, the Department of Energy's Solar Energy Technologies Office benchmarks, communication practices published by the International Electrotechnical Commission for SCADA protocols like IEC 61850, and interconnection guidance from the Solar Energy Industries Association. REIG's own DAS vs. SCADA guide covers the same material in more technical depth for engineering teams who want to read ahead of a call.

Frequently Asked Questions About Solar DAS and SCADA Integration

What is the difference between DAS and SCADA on a solar site?

DAS, or Data Acquisition System, collects raw performance data straight from solar equipment: inverter output, irradiance, module temperature, and string-level current. SCADA, or Supervisory Control and Data Acquisition, sits above the DAS layer and gives operators a plant-wide view, including alarm states and, on most systems, remote control of breakers, trackers, and inverters. Many sites run DAS hardware from the equipment manufacturer and a separate SCADA platform chosen by the owner, which is why the two often cannot share data without an integration project like the ones REIG runs.

How long does solar DAS and SCADA integration take with REIG?

Most REIG projects run six to ten weeks from the first call to commissioning, including the one-to-two-week analysis phase that reviews existing wiring diagrams and protocol documentation. Simple single-site projects with clean documentation can finish closer to four weeks. Larger utility-scale sites with multiple inverter blocks, legacy DAS hardware, or undocumented wiring, like the Kern County project REIG completed in Q3 2023, typically take the full ten weeks because the analysis phase surfaces issues that need to be resolved before configuration starts.

Can REIG integrate with our existing SCADA platform instead of replacing it?

Yes. In most projects, REIG connects a site's existing DAS hardware into whatever SCADA platform the client already runs, rather than replacing either system. REIG's engineers work with common protocols including Modbus TCP, DNP3, and IEC 61850, and the team has integrated with most major SCADA platforms used on utility-scale and distributed solar sites in the United States. Replacement is only recommended when the existing SCADA software is no longer supported by its vendor or cannot communicate using any protocol REIG's hardware supports.

What does solar DAS and SCADA integration cost?

REIG provides a fixed price quote after the in-depth analysis phase in step three, so the number reflects a site's actual wiring, protocols, and hardware rather than a rough estimate. Costs vary by site size, the number of inverter blocks, and how much of the existing DAS and SCADA documentation is accurate versus missing. A single-site community solar project typically costs less than a multi-block utility-scale site that needs custom protocol translation. REIG shares the itemized quote before any engineering work begins.

Does REIG support the system after integration is complete?

Yes. REIG delivers full documentation of every connection, protocol setting, and configuration change made during the project, so a client's own operations staff can maintain and extend the system without REIG on site. REIG also offers ongoing support contracts for clients who want REIG's engineers on call. On the upstate New York project completed in November 2022, the client's staff used REIG's documentation to add two additional inverter blocks to the SCADA system a year later with no outside help.