In recent posts we discussed three pillars of REIG's integrity, innovation, and service. Today we turn to the idea that holds those pillars together on every job site: solar quality control. It is not a single inspection step; it is a standard of grade and characteristic that follows a project from the first torque spec to the last SCADA point. Below, REIG president Keith Davis walks through what that standard looks like in practice, including a commissioning save at a 4.8 megawatt site in Gastonia, North Carolina.

What Is Solar Quality Control at a Solar Asset Level?

Solar quality control at the asset level means two things at once: a measurable grade (does the component meet spec) and a durable characteristic (does the workmanship hold up over decades). REIG checks both on every visit, since a site can pass commissioning and still drift by year two.

A 25 to 30 year panel warranty does not protect against voltage drift, loose terminals, or a mislabeled SCADA point that shows up by year two. Grade covers the component; characteristic covers whether the crew that installed it left the connection the way the drawing called for.

As in our previous posts on integrity, innovation, and service, we start with the dictionary. Quality carries two meanings worth holding onto:

  1. Degree of excellence: the GRADE of a product.
  2. Superiority in kind: the CHARACTERISTIC of a product or offering.

These definitions are self explanatory, so we won't dig into them too deeply. Instead, here is how REIG applies each one on a real solar site.

Grade vs. Characteristic: Two Faces of Quality in Solar PV Work

Grade and characteristic, balanced

Excellence, in Keith Davis's words, is a goal worth chasing in everything. As his father told him, and perhaps yours told you, anything worth doing is worth doing right. Growing up, right meant excellence in building, creating, and living the best way possible: using the correct bolt to fasten two things together, the right diameter, the correct finish for the environment, the exact length, and the correct nut installed and torqued to spec.

Superiority was also an expectation at home: do the best possible work. Keith admits he did not fully live up to that standard in his own schoolwork. The lesson caught up with him once he became a husband and father and had to demonstrate those same values to his own family. He adopted superiority as a personal standard, one that has stayed with him long after his children became parents themselves.

Torque, Tolerance, and the Discipline Behind Every Connection

Torque check, calibrated to spec

A torque spec is a small example with a large consequence. ASTM International publishes the fastener and material standards that most solar racking and electrical connections in the United States are measured against. A bolt torqued below spec can loosen under thermal cycling; a bolt torqued above spec can shear the fastener or crack a bracket. REIG's field techs carry a calibrated torque wrench to every site visit for exactly this reason, and log the reading against the as built drawing, not against memory.

How REIG Builds Solar Quality Control Into SCADA Commissioning

REIG builds solar quality control into SCADA commissioning by testing every point, not a sample. Every data logger is bench tested under simulated load at the Charlotte shop, and every point gets cross checked against the point list on site before commissioning closes.

That point by point check typically adds half a day to commissioning but removes weeks of bad production data later. REIG documents each of these checks inside the SCADA monitoring platform itself, so an asset owner can see the commissioning record next to live production data rather than in a separate binder. That record keeping approach is part of what REIG's solar SCADA monitoring platform is built around, and it is also why REIG's punch lists reference the same point IDs the SCADA system uses in production.

A Commissioning Catch at a 4.8 MW Site in Gastonia, North Carolina

In 2023, during commissioning on a 4.8 megawatt ground mount site in Gastonia, North Carolina, REIG's point by point check caught a mislabeled current transformer that would have silently misreported production on one inverter block. Catching it before the commissioning report closed avoided an estimated six weeks of corrupted production data and a change order that would have cost more than the entire SCADA integration fee. That site is one of several documented in REIG's case studies.

Quality Standards That Anchor Our Solar Quality Control Program

REIG's solar quality control program is anchored to four outside references, not one in house checklist: IEC 61215 and UL 61730 for module and safety listings, ASTM International specs for fastener and structural hardware, and public performance data sets from the National Renewable Energy Laboratory (NREL) for degradation benchmarking. None of these bodies audits REIG directly, but measuring our own work against public standards keeps the program honest.

NABCEP, the North American Board of Certified Energy Practitioners, sets the installer body of knowledge REIG's field commissioning procedures borrow from, even though SCADA integrators are not themselves NABCEP certified installers. Holding four outside references instead of one internal checklist means REIG's quality standard does not grade its own homework.

Comparing Quality Approaches: Checklist Compliance vs. Culture Driven Quality

Two sites can both pass inspection and still carry very different solar quality control outcomes over a 25 year asset life. The table below compares a checklist only approach against the culture driven approach REIG builds toward on every project.

DimensionChecklist Only ComplianceCulture Driven Quality
Inspection timingChecked once, at commissioningChecked at every site visit and remote SCADA review
Torque verificationSpot checked by sampleLogged point by point against as built drawings
Standards referencedManufacturer datasheet onlyIEC 61215, UL 61730, ASTM, NREL benchmarks
Failure discoveryTypically found during a warranty claimTypically found before commissioning closes
Who owns itOne inspector, one dayEvery technician, every visit

Independent studies, including field performance research published by the National Renewable Energy Laboratory (NREL), have found that workmanship and maintenance gaps can measurably reduce a solar asset's energy yield over a 20 to 25 year service life, even when every component carried a passing grade at commissioning. In one widely cited NREL analysis of fielded PV systems, miswiring, loose connections, and other workmanship defects accounted for performance gaps of roughly 2 to 7 percent against modeled output, a range REIG treats as the cost of skipping characteristic checks. That gap is exactly what a characteristic focused quality standard is built to close. It is also why REIG schedules return site visits well past the original commissioning date instead of treating the punch list as the finish line.

So, all of this sounds good, but perhaps abstract? Quality can be a state of mind, but it is also something tangible, reachable, and measurable. Treating it as a mindset means it gets aimed at in every endeavor, every product, every site visit, and every day. A technician who treats a torque reading as a box to check will eventually skip the box. A technician who treats it as a habit will reach for the wrench without being told to.

Team REIG believes in and lives by a solar quality control standard that is part of our culture and who we are. We recognize that to be different, we have to be better, maybe even more than better: excellent and superior, in the right kind of way, measured against outside standards rather than our own comfort.

Until next time,

Keith

###

Keith Davis is the president of Renewable Energy Integration Group (REIG), a Charlotte, NC based firm focused on control, data acquisition, and SCADA in the commercial, industrial, and utility solar PV marketplace. He and his team design hardware, build monitoring software, and provide service beyond what clients expect. REIG takes the complexity out of solar data.

Frequently Asked Questions

What does solar quality control mean on a commercial or utility-scale PV site?
On a commercial or utility-scale PV site, solar quality control means two things at once: grade and characteristic. Grade is the measurable excellence of a component, a torque value within spec, a connector rated for the right amperage, a panel that meets IEC 61215 durability testing. Characteristic is the standard of workmanship that shows up in how a crew runs conduit, labels a combiner box, or documents a commissioning test. REIG treats both as inseparable. A site can pass a visual inspection and still fail a six month performance review if the underlying workmanship was never held to a real standard.
How does REIG apply quality control to SCADA and monitoring hardware specifically?
REIG builds quality control into SCADA and monitoring hardware the same way the original post describes building a wall: right bolt, right diameter, right finish, right torque. Every data logger enclosure gets a punch list check against the as built drawing before it ships. Every RTU gets bench tested at the Charlotte shop under simulated load before it reaches a site. During commissioning, our field team cross checks every analog and digital point against the SCADA point list, not a sample of points. On a recent 4.8 megawatt asset in Gastonia, North Carolina, that point by point check caught a mislabeled current transformer before commissioning closed, avoiding weeks of bad production data.
What standards or certifications inform REIG's solar quality control program?
REIG's solar quality control program draws on four outside references rather than one in house checklist. Panel and inverter claims get checked against IEC 61215 and UL 61730 safety listings. Fastener torque and material specs follow ASTM International guidance for structural hardware. Field commissioning procedures borrow from NABCEP's installer body of knowledge, even though SCADA integrators are not themselves NABCEP certified. Performance modeling and degradation assumptions get benchmarked against public data sets published by the National Renewable Energy Laboratory (NREL). None of those bodies audit REIG directly, but holding our own work to their public standards is what keeps grade and characteristic both honest. Asset owners who ask us which standard REIG certifies to usually get the same answer: all four, because no single one covers panels, fasteners, installation practice, and long term performance at once.
Why does a quality mindset matter more than a one time inspection checklist?
A checklist tells you whether yesterday's work passed. A quality mindset is what makes tomorrow's work worth checking at all. Keith Davis, REIG's president, traces this back to a lesson from his father: anything worth doing is worth doing right, down to the bolt diameter and torque value. Teams that only chase a passing grade on inspection day tend to drift between audits. Teams that treat superiority, REIG's word for characteristic, as a daily habit tend to catch problems before an inspector ever shows up. That difference shows up in uptime data, not just paperwork, across REIG's monitored solar fleet.

Need a SCADA partner who ships proof, not promises?

REIG designs, integrates, and commissions utility-scale solar SCADA, DAS, and fiber networks. Talk to our team.