Solar SCADA monitoring looked different at the end of 2020 than it did at the start of the year, and it will look different again by 2025. REIG Solar's technical team spent the year testing new data acquisition hardware, supporting clients through shelter-in-place orders, and mapping out a plan for how distributed energy resources will change plant monitoring. This letter walks through what changed, what we learned, and what solar SCADA monitoring clients should schedule before year-end.

Different Times: Why Solar SCADA Monitoring Matters More Than Ever

Solar SCADA monitoring matters more in an unsettled year, not less, because the data keeps running even when site visits stop. In 2020, REIG's monitoring systems logged uptime above 99 percent across 41 active operations and maintenance contracts while in-person truck rolls dropped by roughly 30 percent during shelter-in-place orders. The old way of managing a plant, built around a technician driving out every week, could not hold up in 2020. Remote monitoring did.

That shift is not a temporary fix. It is the direction solar asset management was already heading, and 2020 made the case faster than any sales pitch could. The National Renewable Energy Laboratory has tracked a similar move toward remote diagnostics across the broader solar fleet, and REIG's own numbers from last year track closely with that pattern.

REIG Solar technician reviewing live inverter and meter data on a SCADA monitoring dashboard
A REIG technician reviews live inverter and meter data from a client site using REIG's solar SCADA monitoring dashboard.
REIG 2020: Uptime Held While Truck Rolls Dropped Bar chart comparing uptime above 99 percent against a 30 percent drop in truck rolls during 2020 shelter-in-place orders. 99%+ Uptime Down 30% Truck Rolls

REIG's 2020 Hardware Review and the Road to 2025

REIG spent 2020 testing three data logger platforms side by side: a SunSpec Alliance-compliant Modbus TCP gateway, a cellular-first remote terminal unit, and the legacy serial-to-Ethernet converters already installed at most of our older sites. The test ran at an approximately 22 MW utility-scale array in eastern Oregon and an approximately 8 MW community solar portfolio in the Texas Hill Country, two sites with different terrain, different cellular coverage, and different failure patterns.

The cellular-first unit won. In testing, it cut average fault-to-alert time from around 45 minutes down to under 6 minutes, mostly by removing the serial connection as a point of failure. The decision also came down to cost: a single missed truck roll on a rural site often runs $400 to $600 once mileage and technician time are counted, and the cellular-first unit paid for its own hardware cost within the first two or three avoided trips. REIG is standardizing new installs on that platform for 2021, and existing clients on the older serial converters will see it offered as part of their renewal, with REIG covering the labor cost of the swap on multi-year service contracts.

What the 2021 DAS Upgrade Changed for Our Clients

Clients who moved to the new data acquisition system before the 2020 lockdowns kept fewer blind spots than clients still running the older serial setup. That is not a knock on the older hardware. It did its job for years. It just was not built for a year when nobody could drive out to check a loose connection in person. Clients on the cellular-first platform also got a second benefit they did not ask for: because the unit reports over its own cellular network instead of riding on a site's main internet connection, a local internet or power outage no longer took the monitoring feed down with it. REIG's protocol choices also track the interconnection and communication guidance published by the Institute of Electrical and Electronics Engineers, particularly its standards for grid-connected inverter communication. The lesson REIG is carrying into 2025 planning is simple: build the monitoring layer so a person is the backup plan, not the primary one.

Keeping Solar Assets Online During Shelter-in-Place Orders

REIG's operations and maintenance program did not pause in 2020, even though our field schedule changed completely. Technicians who normally drove between four or five sites a week shifted to responding only when the monitoring system flagged a real fault, and REIG's network operations team covered the gap with longer shifts watching dashboards instead of trucks on the road.

The Solar Energy Industries Association reported widespread disruption to field service schedules across the industry in 2020, and REIG was not immune. Two rural service territories saw slower truck-roll response than our normal standard, because fewer technicians were willing to travel between counties during the peak of shelter-in-place orders.

Where We Fell Short: A Vulnerability Beat

We want to be direct about the two rural territories where solar SCADA monitoring data told us about faults faster than our field team could respond. Average response time on open tickets in those territories stretched to nearly four days at one point in the spring, well past our normal 24 to 48 hour standard. That is not a result we are proud of. We added two regional technicians by the fourth quarter of 2020 specifically to close that gap, and response times in those territories are back under 48 hours as of this writing.

Schedule Solar SCADA Monitoring Service Before the Year-End Rush

Solar SCADA monitoring equipment needs the same seasonal attention as the panels and inverters it watches, and October through early November is the window before REIG's service calendar fills up with year-end requests. A firmware audit, a communication link test, and a review of alarm thresholds take most sites under half a day, and catching a loose connection now costs far less than discovering it during the first winter storm.

REIG's DAS and SCADA service team is already booking December slots, and clients who want to lock in a slot before the rush can contact REIG's service team directly rather than waiting for the last two weeks of the year, when most requests get pushed into January.

What REIG's Year-End Service Checklist Covers

  • Firmware updates for data loggers, gateways, and inverter communication cards
  • Cellular and fiber communication link tests at each site
  • Alarm threshold review ahead of winter weather and shorter daylight hours
  • Battery backup checks on monitoring hardware that depends on local power

The 2025 Outlook for Solar SCADA Monitoring and Distributed Energy Resources

By 2025, REIG expects plant performance data to do more than feed a monthly report. The same sensors and gateways already collecting inverter and meter data will feed systems that support battery dispatch, demand response participation, and interconnection studies, turning a single-purpose monitoring feed into shared infrastructure for the plant's other energy services.

The International Energy Agency has pointed to this kind of data convergence as a defining feature of distributed energy resource growth over the next five years, and REIG is piloting the approach now on two sites ahead of a wider 2025 rollout. Our technical team is building this on the same SunSpec Alliance data models already used across our SCADA installs, so clients will not need a separate platform bolted on top of what they already have.

SCADA Monitoring Data Flow at REIG Diagram showing data moving from field sensors to REIG's network operations center and on to distributed energy resource systems. Field Sensors REIG NOC DER Systems

Frequently Asked Questions

What is solar SCADA monitoring and how is it different from a basic DAS?

Solar SCADA monitoring combines real-time supervisory control with the data acquisition system (DAS) that already logs inverter, meter, and weather-station readings. A basic DAS collects and stores performance data for later review, while a full monitoring platform adds live alarms, remote control points, and two-way communication so a technician can see a string fault or a tracker stuck at the wrong angle within minutes instead of waiting for a monthly report. REIG builds its SCADA platforms on SunSpec Alliance data models so the alarms map cleanly to the equipment that triggered them.

How did REIG Solar's clients stay online during the 2020 shelter-in-place orders?

REIG kept clients online in 2020 by shifting from scheduled site visits to continuous remote monitoring. Across 41 active operations and maintenance contracts, truck rolls dropped by roughly 30 percent during the spring shelter-in-place period, yet reported uptime held above 99 percent because the monitoring team could diagnose inverter faults, communication dropouts, and tracker errors from REIG's network operations center instead of waiting for a technician to drive out. Clients running older serial-based data loggers saw more blind spots than clients already on cellular or fiber-connected systems, which is part of why the 2021 hardware review matters.

What hardware is REIG standardizing on for 2021 solar SCADA monitoring installs?

For 2021, REIG is standardizing new solar SCADA monitoring installs on cellular-first remote terminal units that speak Modbus TCP and follow SunSpec Alliance data models, replacing the mix of serial-to-Ethernet converters used on older sites. The change came out of the 2020 hardware review, which tested three logger platforms side by side at an approximately 22 MW array in eastern Oregon and an approximately 8 MW community solar portfolio in the Texas Hill Country. The cellular-first unit cut average fault-to-alert time from around 45 minutes to under 6 minutes in testing, which is the main reason REIG is rolling it out across new contracts first.

When should solar plant owners schedule DAS and SCADA service before year-end?

Solar plant owners should schedule DAS and SCADA service in October or early November, before the year-end rush that hits most operations and maintenance teams in December. REIG recommends a firmware audit, a communication link test for cellular and fiber connections, and a review of alarm thresholds ahead of winter weather, since snow load and short daylight hours change how a plant performs compared with summer baselines. Waiting until late December usually means a longer queue, because every plant owner wants the same tune-up before the first hard freeze and before year-end financial reporting is due.

What does REIG's 2025 roadmap mean for solar asset owners?

REIG's 2025 roadmap ties solar SCADA monitoring data into broader distributed energy resource planning, so a plant's performance data can also inform battery dispatch, demand response participation, and interconnection studies instead of sitting in a single-purpose report. For solar asset owners, this means the same sensors and gateways already collecting inverter and meter data will feed systems that track grid services revenue, not just operations and maintenance reporting. REIG is piloting this approach now on two sites so that by 2025, clients can use one data pipeline instead of layering a separate DER platform on top of existing SCADA monitoring hardware.

Need a SCADA partner who ships proof, not promises?

REIG designs, integrates, and commissions utility-scale solar SCADA, DAS, and fiber networks. Talk to our team.