Communications – Keep Your Team in the Loop

Continuing our series on the three pillars of a solar business, this post covers internal communication: the practice of keeping your own team, not just customers and vendors, in the loop. Weak communication quietly drains morale, slows commissioning schedules, and pushes good people out the door. REIG has tested daily standups, written logs, and SCADA alert routing across real crews, and this guide shares what held up and what did not.
Why Internal Communication Decides Whether a Solar Company Scales or Stalls
Internal communication, not technology or capital, is usually the first thing that breaks as a solar EPC or O&M company grows past a handful of employees. Utility-scale plants carry compliance reporting obligations under NERC's reliability standards, and a crew that cannot pass a status update up the chain on time turns a minor equipment issue into a reportable event.
Most of what gets discussed in solar leadership circles is external: customer updates, utility interconnection paperwork, vendor negotiations, landlord relationships. Those matter, and REIG covers the customer-facing side of the business in an earlier post on service, the second pillar REIG builds every customer relationship on. The internal side, the information that keeps your own crews, engineers, and office staff aligned, gets far less attention even though it determines whether everything external gets executed well.
Start with the word itself. To communicate means, in the plainest dictionary sense, "to convey knowledge of or information about: to make known" and "to reveal by clear signs." Neither definition says anything about intent. Thinking something through in your own head, then assuming the team absorbed it by osmosis, is not communication under either definition. It is just a thought that stayed a thought.
Where REIG Got the Schedule Handoff Wrong
In the fall of 2019, a four-person commissioning crew drove two hours to a site in Gastonia, NC for a scheduled SCADA gateway install, only to find the customer had pushed the date back by a week. The change had been emailed to one project manager three days earlier and never confirmed by phone or relayed to the field team. The crew lost a day, the customer lost confidence, and REIG absorbed the cost of the truck roll. That single missed handoff is the reason every schedule change at REIG now requires a phone confirmation and a same-day entry in the shared project log, not just an email.
Why the Demand for Communication Keeps Growing
The demand for communication, internal and external, keeps climbing as the renewable energy industry grows. The Solar Energy Industries Association tracks a solar workforce that has roughly doubled over the past decade, and the National Renewable Energy Laboratory's own tracking shows utility-scale solar capacity additions climbing by double digits most years, pushing the country's cumulative installed base well past 100 gigawatts. Every added megawatt brings more reports, more drone and thermal imagery, more O&M dispatch calls, and more video meetings. Expect that volume to keep rising, not fall off, as the fleet of operating assets REIG monitors keeps expanding.
The Cost of Weak Internal Communication on Solar Crews and Back-Office Teams
Weak internal communication costs a solar company in ways that rarely show up on one invoice: missed truck rolls, duplicate SCADA tickets, and engineers redoing work someone else already finished. OSHA's own guidance on jobsite hazard communication treats a missed or garbled update as a safety failure, and a crew working from stale information is a crew working at higher risk.
Turnover compounds the cost. A trained field technician or SCADA engineer is not quick or cheap to replace in a specialized industry like solar monitoring, and the hardest seats to fill are often the ones that opened up because the last person in them felt like the last to hear about decisions that affected their work. Every week a seat sits open is a week of delayed truck rolls, slower ticket resolution, and more pressure on the people who stayed.
If you are wearing multiple hats in daily operations, which most owners of growing solar companies are, you think about dozens of decisions every day and often assume that thinking something is the same as sharing it. It is not. Crews and office staff fill information gaps with their own guesses when leadership stays quiet, and those guesses default to the worst-case version of events almost every time.
Building an Internal Communication Rhythm That Works for a Growing EPC or O&M Business
A working internal communication rhythm combines a short recurring meeting, a written record, and a habit of sharing bad news as quickly as good news. REIG runs a 15-minute daily standup, a weekly all-hands call, and a shared project log, and that combination cut duplicate SCADA alert tickets by roughly half within one quarter of adoption.
The table below breaks down which channel REIG uses for which kind of update, and who needs to be on it:
| Channel | Frequency | Audience | Best For |
|---|---|---|---|
| Daily standup | Daily, 15 minutes | Office and on-call field staff | What shipped, what's blocked, today's priorities |
| Weekly all-hands | Weekly, 30 minutes | Whole company | Contracts, staffing, company-level news |
| Shared project log | Continuous | Anyone touching the project | Schedule and status changes with a timestamp |
| SCADA alert routing | Real-time | The engineer responsible for the site | Equipment issues that need an immediate response |
Weekly All-Hands and Daily Standups
The daily standup at REIG runs 15 minutes, covers what shipped yesterday, what is scheduled today, and what is blocked, and includes field staff by phone when they are on site. The weekly all-hands call is longer, usually 30 minutes, and covers company-level news: new contracts, staffing changes, and anything that affects how people plan their week. Dave Ramsey's book EntreLeadership: 20 Years of Practical Business Wisdom from the Trenches devotes its tenth chapter to this exact structure, and REIG covered what it borrowed from that chapter in an earlier post, EntreLeadership 2019.
Written Updates: Email, Project Logs, and SCADA Alerts
Email still carries the formal record: contract terms, schedule changes, anything that needs a timestamp. The shared project log carries the day-to-day status that email buries in a crowded inbox. IEEE's own standards work on monitoring and control systems treats a documented change log as part of the system, not an afterthought, and REIG's SCADA alert routing follows the same logic: it sends every alarm to the one engineer responsible for a site rather than broadcasting it to the whole team. The tool matters less than the habit of using it the same way every time, with a clear owner and a confirmed recipient for every update.
Practical Habits for Keeping Your Solar Team in the Loop
Keeping a team in the loop takes intention, not a new tool. Share plans, next steps, and setbacks in person or on a call before they show up in an email. The Department of Energy's own reporting on the solar workforce shows headcount growing faster than almost any other energy sector, and a faster-growing team is exactly where informal, hallway-only communication stops working.
Do not assume your team gets it just because you thought it through. Let them see you, hear from you, and read updates from you about plans, setbacks, and what comes next. Share the good news and the bad news, not just the wins that make the company look sharp. A crew that hears about a lost contract directly from leadership trusts the next piece of good news more than a crew that only ever hears the highlights. The company's approach to hiring and structure is on the About REIG page.
Until next time, Keith.
Keith Davis is the founder of Renewable Energy Integration Group (REIG), a Charlotte, NC firm focused on control systems, data acquisition, and SCADA for commercial, industrial, and utility-scale solar PV. He and his team build hardware and monitoring software and provide service for solar data across the industry.
Frequently Asked Questions About Internal Communication for Solar Teams
What Counts as Internal Communication at a Solar Company?
Internal communication in a solar company covers every message, meeting, and written update that keeps employees aligned: daily standups, project logs, SCADA alert routing, all-hands calls, and leadership updates about company direction. It is distinct from external communication with customers, utilities, landlords, and vendors. REIG treats this as a dedicated discipline, not an afterthought, because a crew that does not know a schedule changed, or an engineer who never hears why a decision was made, cannot execute well even when the external-facing paperwork is perfect.
Why Does Team Communication Affect Retention?
Employees who do not hear from leadership fill the silence with their own assumptions, and those assumptions are rarely generous. A specialized field like solar SCADA and DAS integration already has a thin bench of trained technicians and engineers, and REIG has seen that the employees most likely to leave are the ones who felt like the last to know about decisions that affected their work. Crews and office staff who get regular, honest updates, including bad news, stay longer and rally harder during tough stretches than teams left to guess at what is happening.
How Often Should a Solar Company Check In With Its Own Team?
There is no universal number, but REIG's experience points to a layered rhythm: something daily, a short standup or a shared log update, something weekly, an all-hands call covering wins, misses, and what is next, and something immediate whenever a schedule, scope, or safety issue changes. The goal of internal communication is not volume for its own sake; it is making sure no one on the team is acting on stale or secondhand information. Over-communicating a schedule change costs minutes. Under-communicating one costs a wasted truck roll.
What Tools Does REIG Use to Keep Crews in the Loop?
REIG combines a handful of plain tools rather than one complicated platform: email for formal updates, a shared project log for schedule and status changes, group messaging for same-day field issues, and video calls for the weekly all-hands meeting. SCADA alert routing also works the same way: it tells the one engineer responsible for a site, not everyone, when it needs attention. The tools matter less than the habit of using them the same way every time, with a clear owner and a confirmed recipient for every update.
What Happens When Schedule Changes Do Not Reach the Field?
When internal communication breaks down, the costs show up in the field, not the inbox. REIG learned this directly in the fall of 2019, when a commissioning crew drove to a Gastonia, NC site for a job that had already been rescheduled by email, because the change was never confirmed by phone or logged for the field team. The crew lost a day, the customer lost confidence, and REIG absorbed the cost of the truck roll. That incident is why schedule changes now require a phone call and a same-day log entry, not just an email.